The project is a Mosque with a central chiller plant used for the air conditioning of the covered area. In addition to a desert cooler system to condition the open court of the mosque. The additional zones use direct expansion system for the air conditioning. The project is using heat pump to pre-cool and heat the domestic water. Electrical system includes power supply station, low current system and emergency power supply with total cooling load of 7,000 T.R and 6 MVA.
Scope of work: Design of MEP Mosque services. Design of HVAC, Lighting, Power Supply including all MEP work.
Donec scelerisque dolor id nunc dictum, interdum gravida mauris rhoncus. Aliquam at ultrices nunc. In sem leo, fermentum at lorem in, porta finibus mauris. Aliquam consectetur, ex in gravida porttitor,