3 Floors multi-discipline mall, with total built-up area of around 40,000 m2. accommodate The project Carrefour Hypermarket, 6 Cinemas and Shopping center.
Scope of work:
MEP services; firefighting; ventilation and air conditioning systems, Central Air conditioning system of 2400 T.R. cooling capacity; electrical power supply and low current systems total power is 4.5 MVA.
1 story of 28,000 m2 building City Center. The building composes of exhibition halls, shopping areas, ground parking garage area and includes central air conditioning system of 3000 T.R. cooling capacity.
Scope of work:
fire fighting; plumbing; ventilation and air conditioning systems; and central plant rooms; motor control centers and building management system for mechanical and electrical systems. Total MEP cost estimated with 400 Million L.E.
Part “C” extension: is an extension to the existing Alexandria city center building including all services like air conditioning, plumbing and Fire Fighting, the extension area is of around 8,000 m2 including food courts, magic plants, pooling area.
Scope of work:
air conditioning, plumbing and firefighting systems, motor control centers and building management system for mechanical and electrical, including the connections to central air, Plumbing and fire fighting system the extension cooling capacity is 450 T.R.
It is a shopping mall of 16,000 m2.
Scope of work:
central air conditioning, Plumbing and Fire Fighting system of 1150 T.R.
The project is 20,000 m2 area extensions to the existing Maadi City Center Mall.
Scope of work:
– Air conditioning, plumbing and Fire Fighting, motor control centers and Building management System mechanical for and electrical systems and the connection to central air conditioning plant and Plumbing and firefighting system. The extension cooling capacity is 1150 T.R.
– Renovations of the existing chiller plant.
– Design and site supervision for all electromechanical System related chiller plant including piping network, motor control center and BMS system to be connected to the existing system.
It is a shopping mall of 16,000 m2.
Scope of work:
central air conditioning, Plumbing and fire fighting system of 750 T.R. Cooling capacity motor control centers and building management system for mechanical and electrical systems.
The project is a 4,000 m2 consisting of 4 story. The building comprising exhibition halls, 4 floors of shopping areas, underground parking garage area.
Scope of work:
firefighting, ventilation and air conditioning system, motor control centers and central air conditioning system of 2000 T.R. cooling capacity.
The project is a 4,000 m2, 4-story building; building composes exhibition halls 4 floors shopping areas, and underground parking, garages area.
Scope of work:
central Air conditioning system of 2000 T.R Cooling capacity, firefighting ventilation and air conditioning systems.
It is a three floor complex project containing six cinemas with total capacity of around 2000 spectators as well as all required Recreational facilities.
Scope of work:
preparation of working drawings, Tender Documents and site Supervision for HVAC and plumbing systems.
Design for air conditioning and Site Supervision.
The project is 12,600 m2, including (two basements and 3 floors) of shops and one floor of clinic.
Scope of work:
Design of all electromechanical systems including electrical, air conditioning, plumbing and Fire Fighting, motor control centers and building management system for mechanical and electrical systems, the cooling capacity is 550 T.R. cooling capacity.
The project is 14,890 m2, including 3 floors of Food and Beverage shops.
Scope of work: Design of all mechanical systems including air
conditioning, plumbing and fire fighting, motor control centers and
building management system for mechanical and electrical systems, The
cooling capacity is 840 T.R. cooling capacity.
It is 3000 m2 hypermarket with 2 MVA total powers and 500 T.R air cooled chiller plant.
Design for a 78,000 m2, 13-story building; building is comprising of exhibition halls 5 floors of shopping areas, 2 floors underground parking garages 5 story residential area the project include central Air conditioning system of 6000 T.R. Cooling capacity.