El-Mansoura Treatment Radiology Hospital, Mansoura, Egypt

The Hospital is serving approximately 200 beds and including special Rooms, Recovery Operation Rooms, Intensive Care Units, Isolation Rooms, and X-Ray department.

Scope of work:

Design review and owner representative for air conditioning system on site to cover all the MEP work (E/M Cost is 25 Million LE).

Dr. Ahmed Okasha Mental Health Hospital-New Cairo, Egypt

The project is considered as a mental health resort serving approximately 100 beds.

The building is four floors with total built-up area of around 7,000 m2, accommodating all up to date mental health care equipment.

Scope of work:

Mechanical Working Drawings and Tender Documents for, Sanitary, HVAC and Fire Fighting systems (E/M budget10 Million LE).

Al Salab Hospital Nasr city, Egypt

The project consists of 6 Operation Rooms, Intensive Care Units and around 100 beds.

The building is four floors with total built-up area of around 7,000 m2, accommodating all up to date medical equipment including Operation Rooms, Recovery Rooms, kitchen and laundry services, with medical gas system, chiller plant, and electrical system.

Seashell Hospital

The project is 6 floors building with 15,000 M2 build up area, the hospital is serving around 100 beds and a complete outpatient clinics in addition the hospital includes 7 operation rooms, Recovering area, intensive and critical care units for 30 beds, new born intensive care unit, endoscopy department, cath labs kidney dialysis, diagnostic x rays, emergency department sterilization and packing zone kitchen and laundry services.

 

Scope of work:

MEP systems design including HVAC, Plumping, Medical gas Fire Fighting and Electrical systems.

Kuwait Cancer Center (KCC)

The project is 14 floors building with 357,660 m2 built up area,the hospital is serving around 528 beds and a complete Out Patient Clinics, in addition the GSH includes 15 OperatingTheaters, two Intensive care unit for 30 beds, Diagnostic X-Ray and Ultrasonic Department, Hemodialysis Department for 6 units and a Maternity Unit.

 

Scope of work:

preliminary design and preparing of bill of quantity and schedule of electromechanical Systems, Electrical system, plumbing, firefighting central, medical gas system to the latest HTM 2022 standards, Fire Fighting system, air conditioning plant capacity is 11,660 TR.

Al Safwa Hospital 6 October, Egypt

The project is considered a health resort serving about 100 beds:
The building is 4 floors with total built-up area of around 7,000 m2, accommodating all up to date
equipment including Operation Rooms, Recovery Rooms, kitchen and laundry services.

Scope of work:

all mechanical systems including plumbing, fire protection and Medical gas system.

Dar-El-Mona for Child Care, Giza, Egypt

The project is a mentally retardant child-care hospital consisting of 3 connected buildings 

each is four floors, as well as sports, social and educational facilities.

The chiller plant is an air-cooled plant with 800 TR capacities.

 

Scope of work:

MEP systems design including HVAC, plumbing, fire
protection systems and Medical gas system.

Katameya Clinic - 1 , Cairo, Egypt

The hospital is serving about 120 beds, 5th floor

building hospital project including operation rooms, operation recovery rooms, and cafeteria and doctors’ offices (E/M Cost is 72 Million LE).


Scope of work:

all MEP systems including electrical, HVAC, plumbing, firefighting and Medical gas systems using bulk oxygen tank.

Katameya Clinic - 2, Cairo, Egypt

The hospital is serving about 70 beds, 5th floor building hospital project including operation rooms, operation recovery rooms, and cafeteria and doctors’ offices.


Scope of work:

all MEP systems including electrical, HVAC, plumbing, firefighting and Medical gas systems using bulk oxygen tank.

Emergency Hospital, Qena, Egypt

The hospital is serving about 250 beds and 5th floors, building hospital project including Operation Rooms, Operation Recovery Rooms, and cafeteria and doctors’ Offices.


Scope of work:

all MEP systems including electrical, HVAC, plumbing, firefighting and Medical gas systems using bulk oxygen tank.

Applicants Syndicate Hospital Cairo, Egypt

Mechanical, Medical piping, firefighting system and air conditioning system of 300 T.R cooling capacity for 100 room hospital.

The Hammad Medical Tower Hospital, Doha Qatar

The project is a 3 floors building with 40,000 m2 built up area, the hospital is serving around 125 beds and a complete Out-PatientClinics.

In addition, the GSH includes three Operating rooms,Intensive care unit for 5 beds,Diagnostic X-Ray and Ultrasonic Department, Hemodialysis Department for 6 units and a Maternity Unit.

 

Scope of work:

Mechanical works, central medical gas system to the latest HTM 2022 standards, fire fighting system.

Air-conditioning plant capacity is 1000 TR.

Infection Diseases Hospital, Kuwait

The project is 8 floors building with 57,500 m2 built up area, the hospital is serving around 224 beds and a complete Out-Patient Clinics, in addition the GSH includes, 5 Intensive care unit for 40 beds, Diagnostic X-Ray and Ultrasonic Department, Hemodialysis Department for 6 units and a Maternity Unit.

 

Scope of work:

preliminary design and preparing of bill of quantity and schedule of electromechanical Systems, Electrical system, plumbing, Fire Fighting central medical gas system to the latest HTM 2022 standards, Fire Fighting system, air conditioning plant capacity is 5500 TR.

Applicants Syndicate Hospital (Cairo – Egypt)

Mechanical, Medical piping, firefighting system, and air conditioning system of 300 TR cooling capacity for 100-room hospital.

Seashell Hospital

The project is a 6 floors building with 15,000 M2 built up area. The hospital was designed to include 150 beds and a complete outpatient clinics. In addition, the hospital includes 7 operation rooms, Recovery units for 30 beds, Critical care units for 30 beds, Newborn intensive care unit, Endoscopy department, Sterilization, Cath lab, Kidney dialysis, Diagnostic X-ray, Emergency department, Packing zone kitchen and laundry services.

Scope of work:
MEP systems design including HVAC, Plumbing, Medical gas, Fire Fighting, and Electrical systems.