copper cables production plant
Scope of work
includes the design and electrical Site supervision, low current, heating, Ventilation and air conditioning, industrial Cooling water to the production equipment Compressed air system, plumbing, fire fighting systems and external networks. The Project comprises plant rooms, production building and storage building.
new ceramic factory with an area of over 300000m2 and 9 lines of ceramic lines.
Scope of work
work drawings, Tender documents, and site supervision for all MEP works with total cost of 200 Million S.R.
one of the major factories for Pre-stressed concrete pipes
Scope of work
project’s Design and Site supervision of Electrical and
Mechanical system.
It is a pharmaceutical product manufacturing Plant and all related accessories. The built up area is around 8,000 m2 including a separate 4 floors Administration Building.
Scope of work
Mechanical Workshops and Asbuilt Drawings for heating, ventilation, air conditioning, Sanitary and Fire Fighting Systems
It is a new ceramic factory with an area of over 300000m2 and 9 lines of ceramic lines.
Scope of work
work drawings, Tender documents, and site supervision for all MEP works with total cost of 200 Million S.R.
It is Kaolin Bearing silica sand raw material for ceramic industry producing plant. The total power is 3MVA.
Scope of work
Mechanical system, including Factory building and power plant station.
It is a pharmaceutical factory consisting of The following buildings:
Production building (Two floors each around 8000m2),
Administration building (Four floors each around 1300 m2),
Social building (Two floors each around 800 m2)
Service building (Two floors eacharound 400 m2),
Substation building (Two floors each around 1000 m2),
Mosque (Around 140 m2).
Scope of work
Mechanical Workshops and Asbuilt Drawings for heating,
ventilation, air conditioning, Sanitary and Fire Fighting Systems.
The project includes the design
of heating, ventilation and air
conditioning
installations,
plumbing and Fire Fighting
systems, electrical motor control
systems, building management
system and external networks. Also plant rooms, Knitting, production farm
containing a 100 machines, Sewing Halls, Printing areas, Dyeing plant,
spin and textile storage areas, Administration building and storage
building for Cotton and fabrics. Plant capacity is 4000 TR (E/M Budget is
160 Million Egyptian pounds)
Scope of work
The project includes the design of heating, ventilation and air conditioning installations electrical motor control systems . building management system and external networks; plumbing and Fire Fighting systems and external networks. It also includes knitting production farm containing 20 machines; Sewing Halls; Printing areas; Dyeing plant; spin and textile storage areas; Administration and storage buildings. Plant capacity is 1000 TR.
It is a manufacturing of Needle syringe products Plant and all related accessories. The built up area is around 10,000 m3 including 4 Administration Floors
Scope of work
working Drawings preparation, Tender Documents and site Supervision for HVAC system
at 6th October City: It is cans manufacturing plant with a built up area around 25000 m3 including 2 separate administration building floors and a 6 MVA Transformers substation. The project is equipped with L.P.G station
Scope of work
working Drawings preparation, Tender Documents and HVAC system computerized operated system site supervision.
It is DAEWOO cars manufacturing plant with a built up area around 50,000 m2 including 2 Administration separate Buildings factory bays and Transformers substation. The project is equipped with L.P.G station; Steam generation plant; compressed air generation plant; industrial and de-ionized wate treatment plants
Scope of work
The working Drawings preparation, mechanical system
Tender Documents and site Supervision
Heating, ventilation and air conditioning System, Plumbing and Fire Fighting System including the coordination with international process firms
Scope of work
The project consists of three buildings as following:
Maintenance Building.
Control Building.
Warehouse Building.
HVAC System, Plumbing System and Fire Fighting System Dessign work.
The project consists of three buildings as follows:-
Compressor Substation Building.
Main Substation Building.
Propane Condenser Substation Building.
The project includes the design and site supervision of installations of MEP works; heating, ventilation and air conditioning; plumbing and fire fighting systems and external networks; plant rooms; production building and storage building.
The project includes the design and installations of is for MEP works, Heating, ventilation and air conditioning, plumbing and firefighting systems and external networks. Project includes plant rooms, production building and storage building.
The project is a metal production factory of around 2,500 m2 and 3 floors administration building
Scope of work
Complete Mechanical Works.
It is an factory extension of food production in 6th October consists of welfare building, TC and BC lines and 4 floor Administration Building
Scope of work
MEP, HVAC, plumbing, firefighting work, including Electrical work. Total cooling load of the project is 300T.R and 3 MVA
It is a food production extension factory at Obour city consists of welfare building, TC and BC lines and 4 floors administration building
Scope of work
Design MEP, HVAC, plumbing, fire fighting work, including Electrical work, Project Total cooling load is 800T.R absorption chiller.
It is a food production factory Asyut extension.
Scope of work
MEP, HVAC, plumbing, firefighting work, including Electrical work Design and site supervision
It is a food production factory extension in Tanah.
Scope of work
Design and site supervision of MEP, HVAC, plumbing, firefighting work, including Electrical work
It is a beauty care product production plant.
Scope of work
includes the design and site supervision of Heating, ventilation and air conditioning, water supply to the production plant, plumbing and fire fighting systems and external networks. The Project includes plant rooms, production building and storage building. Mechanical Design and Supervision (Budget is 7 Million).
Scope of work
Design of the ventilation and the air conditioning system and fire fighting systems.
It is a perfume product Factory.
Scope of work
Design of Heating ventilation and refrigerant system, firefighting system and Plumbing system for the factory by using direct expansion system for HVAC System.
Project with total built up area of 150,000 m2. It includes the preparation of sound calculation; fire fighting, MEP, electrical fire alarm plumbing and Air conditioning systems for 24 industrial buildings for steel manufacturing plant
Scope of work
Plumbing and Air conditioning system for apharmaceutical manufacturing plant
It is a carpet production factory of 2000 m2 built up area.
Scope of work
Air conditioning systems
A medical supplies equipment factory over a built- up area of 3000 m2,
the total power is 1 MVA with 400 T.R Air cooled chiller plant.
A factory for making pets and dolls from fibers and textiles.
A cosmetics producing factory with built up area 10,000 m2.
Scope of work
Complete Mechanical work.
It is a carpet production factory of 2000 m² built-up area.
Scope of work:
Air conditioning systems.
A medical supplies equipment factory over a built-up area of 3000 m².
The total power is 1 MVA with 400 T.R Air cooled chiller plant.
A factory for making pets and dolls from fibers and textiles.
Scope of work: All MEP work.
Acosmetics-producing factory with a built-up area of 10,000 m².
Scope of work:
Complete Mechanical work.