Maintenance programs for the Escowa Building, Beirut, Lebanon, comprehensive maintenance management system including assets lists; planned maintenance instruction; for a 13-story building;
usable space comprising exhibition halls; 5 story parking garage; office building of 8 stories including air conditioning system of 1500 T.R.
Design of the ventilation and air conditioning system and fire fighting system for the following areas: Library Hall; Microfilm Hall; Information Center; Camera Hall; Research Hall; Documented Study and Research Center; Biological Lab; Chemical Lab; Patch Lab, Hand Fitting and Repair Lab; Cladding workshop.
A project includes 6 floors office building and showrooms with total power of 2 MVA and 400T.R Air-cooled chiller plant.
Scope of work:
Working Drawings, Tender Documents for MEP work. MEP Budget: (Approx. is 25 Million EGP).
It is a power supply project covering around 4,000 m2 including a separate 5 floors and include central air conditioning system of 255 T.R. cooling capacity.
Plumbing and air conditioning (HVAC) services for a 6 floors office building including two basements levels.
Design review for a 13-story building, usable space comprising exhibition halls, 5 stories parking garage, office building of 8 stories including air conditioning system of 1500 T.R.
The project is considered the new Kuwait Embassy in Egypt covering around 2500 m2 built up area directly on the Nile side, accommodating Embassy Assembly the and Consulate offices, distributed on the first 6 floors Also another three floors for residential facilities, the building is fully equipped with all modern High-Tec facilities and an Air cooled chiller plant of around 600 T.R.
Scope of work:
Mechanical working drawings, Tender Documents for Sanitary, Fire Fighting and HVAC systems. (E/M Budget is 18 Million EGP).
Design of the ventilation and the air conditioning system and fire fighting system for the following building Reinforced Shields; areas: Main Reading Hall; Technical Library Section; OPAC; Book Exhibition; History of Arabic Calligraphy, Amphitheater; Lecture Hall; Research Hall; Computer Information Center and Stacks for Arabic Calligraphy; Papyrus Hall; Department Head of Microfilm; Administrative Office for Microfilm; Microfilm Unit CD Hall; Internet and Cable Systems; Stacks and Manuscripts Stacks; Stacks Preparation; Dark Rooms; Sterilization Unit; Verification Center & Research Area for Stacks.
ABC Head Quarter is a 6 floors office building accommodating around 1000 employees with all modern intelligent systems; the total connected load is 2 MVA with 500 T.R cooling plant capacities.
Scope of work:
the project’s MEP, Mechanical and Electrical system.
Raya Head Quarter is a 7
Floors office building for Raya
Company with total power of
4.5 MVA and 1000 T.R air
cooled chiller plant.
Tower is a28 Floors with total
built-up area of 24,000 m2, the
total load is 4.5 MVA with
district cooling HVAC system.
Scope of work: Working drawings and tender documents for all MEP
work.
5 Residential towers from 12 to 16 floors with common basement and ground floors. The total power is 11 MVA with district cooling HVAC system.
Scope of work:
Working drawings and tender documents of all MEP work.
A residential LEED certified tower, 28 floors with built-up area of 24000 m2, the total load is 4.5 MVA with district cooling HVAC system.
Scope of work:
Working drawings and tender documents for all MEP work.
A residential LEED certified tower, 12 floors and 2 basements with built-up area of 24,000 m2.The total load is 4.5 MVA with a central air conditioning cooling HVAC system.
Scope of work:
Working drawings and tender documents for all MEP work.
4 residential towers 13 floors each with common basement and ground floor, including shops, gym and car parking with district cooling HVAC system with total area of 3,800 m2.
Scope of work:
working drawings and tender documents of all Mechanical work. Electrical Motor control centers and Building Management System.
28 floors and 4 basements with built-up area of 24,000 m2. The total load is 4.5 MVA with district cooling HVAC system.
Scope of work:
working drawings and tender documents for all MEP work.
A project including Mechanical
works,
Plumbing and air conditioning
services for a 6 floors office
building.
6 floors, Office building for Al-Ashraaf syndicate with total power of 1 MVA.
Scope of work:
working drawings, tender documents and site supervision
for all MEP works with total budget of 6,000,000 EGP.
The project consisting of 6 floors administration office building and two basements.
Scope of work:
includes Plumbing and air conditioning, Building management system and Electrical Motor Control Centers.
It is an Administration Building project in Egypt, composed of 5 floors. The building is fully equipped with all modern High Tec facilities and an Air-cooled chiller plant of around 2000 T.R.
Scope of work:
design of electromechanical Working Drawings, Tender Documents for Electrical, Plumbing, Fire Fighting and HVAC systems. (E/M Budget is 40 Million LE).
The project is Administration Building including one basement and 4 floors of office building with all modern advanced systems, the total load is 2 MVA with 440 T.R cooling plant capacities.
Scope of work:
design of electromechanical Working Drawings, Tender Documents for Electrical, Plumbing, Fire Fighting and HVAC systems (E/M Budget is 40 Million LE).
A project includes 6 floors of stores and 1000 R. Ton air-cooled chiller plant.
Scope of work:
Design and tender documents for MEP work. MEP Budget: (approx. 25 Million EGP).
The project is Administration Building including 3 floors of office building with all modern intelligent systems, the total load 320 T.R cooling plant capacities.
Scope of work:
design and site Supervision of Working mechanical Drawings, Tender Documents for Plumbing, Fire Fighting and HVAC systems (Budget is 10 Million LE).
The project supply special services for laboratory area including Plumbing
and Utility Service networks.
It is an Administration Building project composed of 4 floors office building with all modern advanced systems, with a direct expansion system conditioning.
Scope of work:
design and site supervision of electromechanical Working Drawings, Tender Documents for Electrical, Plumbing, Fire Fighting and HVAC systems (estimated budget 10 Million LE).
It is an Administration Building project composed of 3 basements and 4 floors office building with all modern advanced systems, the total load is 2 MVA with 300 T.R cooling plant capacity.
Scope of work:
design of electromechanical Working Drawings, Tender Documents for Electrical, Plumbing, Fire Fighting and HVAC systems (Estimated Budget 10 Million LE).
It is an 8 towers residential building.
Scope of work:
MEP district utilities and all MEP work.
It is an Administration Building project including one basement and 4 floors of office building with all modern advanced systems, the total load is 420 T.R cooling plant capacities.
Scope of work:
design of mechanical Working Drawings, Tender Documents for Plumbing, Fire Fighting and HVAC systems (Estimated Budget 10 Million LE).
The project is Administration Building in Egypt including two basements and 5 floors as well as, the building is fully equipped with all modern High-Tec facilities and an Air-cooled chiller plant of around 825 T.R.
Scope of work:
mechanical Working Drawings, Tender Documents for Plumbing, Fire Fighting and HVAC systems (E/M Budget is 18 Million LE).
The ventilation and the air conditioning system Design. Plumbing and firefighting systems for a tower at Nile side.
Scope of work:
mechanical working drawings, tender documents, sanitary, fire fighting and HVAC systems.
The project is 16 floors with 18,000 m2 built–up area accommodating 1000 employees, the total powers is 4 MVA and 1200 T.R air-cooled chiller plant.
A group of residential towers in Saudi Arabia 5 residential towers from 6 to 7 floors with common basement and ground floors, the total power is 11 MVA.
Scope of work:
working drawings and tender documents of all MEP work.
MEP design for a palace compound at Riyadh of 20,000 m2 built up area.
Design and construction review of troops house Air-Conditioning system
including public areas, 3 restaurants, 3 exhibition halls, kitchen area, cold
rooms and 100 rooms hotel.
Design for a 10,000 m2, 3 story building comprising exhibition halls,
shopping areas, Health Club, Bowling, Gymnasium, Multipurpose sports
hall. Air conditioning system is of cooling capacity 1000 T.R.
Upgrading of the air conditioning system of Egyptian petroleum company, main office of 800 T.R. cooling capacity of the main company administration building.
A project including plumbing and air conditioning services of an office building of 6 floors at 10th of Ramadan city.
Air conditioning of a theatre of 10,000 m2 have central air conditioning plants.
It is an Administration Building project including two basements and an Office building composed of 7 floors with all modern advanced systems, the total load is 630 KVA with 240 T.R cooling plant capacities.
Scope of work:
design and site super vision of electromechanical Working Drawings, Tender Documents for Electrical, Plumbing, Fire Fighting and HVAC systems (Budget is 30 Million LE).
Hill House is a multi- purpose building consisting of 6 floors (Ground to Sixth Floors) that is located at AUC campus , Down Town – Cairo with a total built up area of 4,000 m2 including Classrooms , Computer Labs, Library, Multi-Purpose Halls, Galleries, Research, Reading, Study and Treatise Rooms.
Scope of work:
Complete Mechanical design ,tendering & awarding and site supervision for the renovation works of all mechanical services including Air conditioning and Ventilation system (HVAC) using water cooled chillers and cooling towers, Firefighting system, Plumbing system , Motor Control Center (MCC) and Building Management System (BMS).
The project is 3 floors building with 28000 m2 built up area, the project is a branch of Germany University in Hurghada for a specialized researching college to be used in research labs and specialized labs.
Scope of work:
design of mechanical chiller and central medical gas system drawings and tender documents, sanitary, HVAC, plumbing and pure water & Fire Fighting systems. The chiller plant consists of three chiller each of 800 Ton refrigerant (E/M budget is 60 million LE).
The project is a portion of Ayaa’ al Hay Mosataqbal hospital with 350 m2 building built up area for radioactive material control room, x-ray, nuclear test. Consists of IX- Bunker vault, control rooms, scanning, clinics, dressing rooms, waiting areas, Server and UPS rooms.
Scope of work:
design of HVAC system.
It is a new administration building for Integrated Medical Center (IMC) with total built up area of 4500 m2, 3 floors building. The project is used for new expansions for medical facilities including labs and offices, specialized labs. The building consists of specialized labs for nuclear tests and medical gases system.
Scope of work:
design of mechanical systems (medical gases system, sanitary, plumbing, fire fighting, HVAC system, etc).