The project consist of main building and 6 small serving buildings the total area of the project is 30000 m2 including all advanced facilities required. The total cooling load 1,680 TR of water-cooled chiller plant.
Scope of work
design of electromechanical system including electrical, low current, heating ventilation and air conditioning system, smoke management system, plumbing system, irrigation system and firefighting system.
The project consist of main building and 4 small serving buildings the total area of the project is 22,000 m2 including all advanced facilities required. The total cooling load is 1400 TR of air-cooled chillers plant
Scope of work
design of electromechanical system including electrical, low ventilation current, heating and air conditioning system, smoke management system, plumbing system, irrigation system,
firefighting system and telecommunications system.
The project consists of four buildings of automated people mover.
Scope of work
design review, engineering value and site supervision system, for mechanical which include air conditioning system, plumbing and firefighting system.
Concept design report for environmental air conditioning of open tents to house 250,000 pilgrims.
The project consist of main building and 4 small serving buildings the total area of the project is 18,000 m2 including all advanced facilities required. The total cooling load 1400 TR of air-cooled chiller plant.
Scope of work
design of electromechanical system including electrical, low current, ventilation and air conditioning system, telecommunications plumbing system, irrigation system and firefighting system.