It is an open stadium with
around 26,000 Attendants. The
main building contains indoor
Conference Hall for 200
attendees, Offices, Cafeteria
and VIP Lounge, The Site
accommodate another three main buildings.
Scope of work: Working Drawings, Tender Documents and Site
Supervision for: Sports Lighting, General and Outdoor lighting Power,
Low-current systems and Score Boards system also including Sanitary
design inside and outside buildings besides the stadium systems areas,
V.I.P lounges and landscape work Heating, Ventilation and Air
conditioning system and Central utility plants. (E/M Budget is around 40
Million U$ Dollar).