The project is a 3 floors building with 40,000 m2 built up area, the
hospital is serving around 125 beds and a complete Out-Patient Clinics. In addition, the GSH includes three Operating rooms, Intensive care unit for 5 beds, Diagnostic X-Ray and Ultrasonic Department, Hemodialysis Department for6 units and a Maternity Unit.
Scope of work: Mechanical works, central medical gas system to the latest HTM 2022 standards, fire fighting system. Air-conditioning plant capacity is 1000 TR.

Dr. Ahmed Okasha Mental Health Hospital, New Cairo,

The project is considered as a mental health resort serving approximately 100 beds.

The building is four floors with total built-up area of around 7,000 m2 , accommodating all up to date mental health care equipment.
Scope of work: Mechanical Working Drawings and Tender Documents for, Sanitary, HVAC and Fire Fighting systems (E/M budget10 Million LE).

Al Salab Hospital Nasr city, Egypt:

The project consists of 6
Operation Rooms, Intensive Care
Units and around 100 beds. The
building is four floors with total
built-up area of around 7,000 m2
, accommodating all up to date
medical equipment including
Operation Rooms, Recovery Rooms, kitchen and laundry services, with
medical gas system, chiller plant, and electrical system.

El-Mansoura Radiology Treatment Hospital, Mansoura, Egypt

The Hospital is serving
approximately 200 beds and
including special Operation
Rooms, Recovery Rooms,
Intensive Care Units, Isolation
Rooms, and X-Ray department.
Scope of work: Design review and owner representative for air conditioning
system, on site to cover all the MEP work (E/M Cost is 25 Million LE).

Dar-El-Mona for Child Care, Giza, Egypt

The project is a mentally retardant
child-care hospital consisting of 3
connected buildings; each is four
floors, as well as sports, social and
educational facilities. The chiller
plant is an air-cooled plant with

800 TR capacities.
Scope of work: MEP systems design including HVAC, plumbing, fire
protection systems and Medical gas system.

Katameya Clinic - 1 , Cairo, Egypt:

The hospital is serving about 120
beds, 5
th floor building hospital
project including operation rooms,
operation recovery rooms, and
cafeteria and doctors’ offices (E/M
Cost is 72 Million LE).
Scope of work: all MEP systems including electrical, HVAC, plumbing,
firefighting and Medical gas systems using bulk oxygen tank.

Kuwait Cancer Center (KCC)

The project is 14 floors building
with 357,660 m2
built up area,
the hospital is serving around
528 beds and a complete Out-
Patient Clinics, in addition the
GSH includes 15 Operating
Theaters, two Intensive care unit
for 30 beds, Diagnostic X-Ray
and Ultrasonic Department,
Hemodialysis Department for 6

units and a Maternity Unit.
Scope of work: preliminary design and preparing of bill of quantity and
schedule of electromechanical Systems, Electrical system, plumbing,
firefighting central, medical gas system to the latest HTM 2022 standards,
Fire Fighting system, air conditioning plant capacity is 11,660 TR.

Al Safwa Hospital 6 October, Egypt

The project is 14 floors building
with 357,660 m2
built up area,
the hospital is serving around
528 beds and a complete Out-
Patient Clinics, in addition the
GSH includes 15 Operating
Theaters, two Intensive care unit
for 30 beds, Diagnostic X-Ray
and Ultrasonic Department,
Hemodialysis Department for 6

units and a Maternity Unit.
Scope of work: preliminary design and preparing of bill of quantity and
schedule of electromechanical Systems, Electrical system, plumbing,
firefighting central, medical gas system to the latest HTM 2022 standards,
Fire Fighting system, air conditioning plant capacity is 11,660 TR.

Applicants Syndicate Hospital Cairo, Egypt:

Mechanical, Medical piping, firefighting system and air conditioning system of 300 T.R
cooling capacity for 100 room hospital.

Katameya Clinic - 2, Cairo, Egypt

The hospital is serving about 70 beds, 5
th floor building hospital project
including operation rooms, operation recovery rooms, and cafeteria and
doctors’ offices.
Scope of work: all MEP systems including electrical, HVAC, plumbing,

firefighting and Medical gas systems using bulk oxygen tank.

Emergency Hospital, Qena, Egypt

The hospital is serving about 250 beds and 5th floors, building hospital
project including Operation Rooms, Operation Recovery Rooms, and
cafeteria and doctors’ Offices.
Scope of work: all MEP systems including electrical, HVAC, plumbing,
firefighting and Medical gas systems using bulk oxygen tank.

Infection Diseases Hospital, Kuwait

The project is 8 floors building with 57,500 m2
built up area, the hospital
is serving around 224 beds and a complete Out-Patient Clinics, in addition
the GSH includes, 5 Intensive care unit for 40 beds, Diagnostic X-Ray and
Ultrasonic Department, Hemodialysis Department for 6 units and a
Maternity Unit.
Scope of work: preliminary design and preparing of bill of quantity and schedule of
electromechanical Systems, Electrical system, plumbing, FireFighting central medical
gas system to the latest HTM 2022 standards, Fire Fighting system, air conditioning

Seashell Hospital

The project is 6 floors building
with 15,000 M2 build up area,
the hospital is serving around 100
beds and a complete outpatient
clinics in addition the hospital
includes 7 operation rooms,
Recovering area, intensive and
critical care units for 30 beds,

new born intensive care unit,
endoscopy department, cath labs
kidney dialysis, diagnostic x rays, emergency department sterilization and
packing zone kitchen and laundry services.
Scope of work: MEP systems design including HVAC, Plumping, Medical
gas Fire Fighting and Electrical systems.